| Brand Name: | SZLeadray |
| Model Number: | LGH-60W |
| MOQ: | 1 Piece |
| Price: | USD 75-210 / Piece |
| Delivery Time: | 7-15 days after payment |
| Payment Terms: | T/T,L/C |
The LGH-60W is the model we point at when a buyer wants a garden light that behaves like a small street light. 10800 lumens, 5050 LED source, a 90W 18V monocrystalline panel and a 12.8V 42Ah LiFePO4 pack, all inside one housing with the black and orange trim that makes it easy to spot on a project site.
The part that genuinely changes how it feels at night is the adaptive colour temperature. The controller reads conditions and shifts CCT between warm and cool, so a rainy evening gets a different light than a clear one. That is not a gimmick on a path: it keeps visibility comfortable instead of harsh.
Mounting is 3-5 metres, spacing 8-10 metres, and there is no cable to lay. Body is aluminium alloy, sealed against corrosion and rust, and it is rated to discharge from -20°C to +60°C, so a desert site and a cold mountain site can use the same lamp.
![]()
| Parameter | LGH-40W | LGH-60W | LGH-80W | LGH-100W |
|---|---|---|---|---|
| Power of PV Module | 70W 18V | 90W 18V | 120W 18V | 160W 18V |
| LiFePO4 Battery | 12.8V 36AH | 12.8V 42AH | 12.8V 60AH | 12.8V 80AH |
| LED Brand | 5050 | 5050 | 5050 | 5050 |
| LED Qty (pcs) | 112 | 112 | 112 | 224 |
| Light Mode | Time Control | Time Control | Time Control | Time Control |
| Rainy Days (D) | 3-5 | 3-5 | 3-5 | 3-5 |
| Luminous Flux (Lm) | 7200 | 10800 | 14400 | 18000 |
Beam angle is the specification most buyers skim past and later wish they had not. A 60° lens pushes light down a narrow lane beautifully and leaves everything else dark; 80° x 150° washes a courtyard evenly. We can supply a mix in one order so a site is lit properly instead of uniformly.
Because the modules are distributed across the face, the fixture does not have that single bright hotspot in the middle of the ground. The illumination reads as one even field, which is what municipal and resort reviewers actually look at.
![]()
![]()
LEADRAY is a Shenzhen manufacturer of integrated solar street lights, split solar lamps and outdoor landscape fixtures. We started in 2005, run with 300-500 people, and ship 80-90% of production abroad. Mold development, CNC machining, die-casting and assembly are all in house, which is why a special housing colour or a mounting change is a normal request for us.
The on-site laboratory does weighing checks, photometric testing, aging test, IP waterproof and dust testing and temperature cycling on every production batch. A solar lamp that is 10% short on panel output will still pass an eye test and fail in the field, so we measure instead of guessing.
The LGH series is one of our working horses on overseas projects: rural roads, residential communities, parking areas, parks, squares and construction sites across Africa, the Middle East and South America. We have the field feedback to know which beam angle suits which layout, and we will tell you when a bigger model is simply a waste of budget.
Full service from us means parameter recommendation for your site, customization, installation guidance, spare parts and a 3-year warranty. Buyers are welcome to visit the factory and check a unit against its own datasheet before placing a container order.
Output and mounting height, mainly. 10800 lumens on a 3-5m pole covers a garden, courtyard or path generously; the same lamp on an 8-10m road pole belongs to the street light range.
The controller reads ambient conditions and shifts the CCT between warm and cool so visibility stays comfortable. You can also lock a fixed value if a project specification requires it.
Narrow (60°) for lanes and long paths, 90° for general garden use, 80° x 150° for wide courtyard washes. Send the layout and we will recommend a mix.
3-5 consecutive rainy days in normal mode, with 6-8 hours of charging in strong sun and 10-12 hours of full-power lighting on a full pack.
3 years on the lamp. Non-human damage inside the warranty period is covered with spare parts support, and we keep common components in stock so a replacement is not a six week wait.