Municipal lighting is not bought; it is scored. A committee reads a written specification, marks each clause, and an auditor checks the result after installation. Suppliers who understand the scoring table win before the price envelope is opened.
Committees ask for a maintained lumen figure. The LC3-80W declares 9,000 lm typical from 150 LED chips at 80W with a 140W PV module. Declared values matter because the lighting calculation in the bid is built on them; an optimistic number that cannot be reproduced becomes a defect claim later.
A bright lantern on a narrow carriageway spills light into gardens and windows. T3 distribution puts intensity on the road and keeps spill low. For municipal approval, this is often the deciding technical point, because resident complaints are a political cost the committee wants to avoid.
Tenders increasingly specify dimming profiles. The fixture supports PIR motion sensing with a dimmed baseline and boosted output on detection, plus dusk-to-dawn control. The scored question is not “does it dim" but “can the profile be locked so the contractor cannot change it after handover".
![]()
| Scored item | What a strong answer includes |
|---|---|
| Housing | Die-cast aluminium, corrosion treatment, IP65 seals |
| Battery | LiFePO4, cycle life at operating temperature |
| Serviceability | Driver, sensor and battery replaceable separately |
| Spares | Priced kit and availability for the contract term |
| Documentation | Test reports, BOM, installation drawings |
Split systems separate the panel from the lamp head, which suits sites where the panel cannot sit on the pole. That flexibility is scored under programme risk: can the contractor install without new trenching, and can the work be phased around traffic? A two-person crew and a bracket that fits existing poles answer both questions.
![]()
“We do not mark the brochure. We mark the documents that survive an audit." — Tender committee member, municipal project
For suppliers, the lesson is to write bids the way auditors read them: traceable numbers, named parts and a service plan with prices. For buyers, it is to put those clauses in the document before the first bid arrives.