Retrofit Before Replacement: The Lagos Market Road Solar Lighting Business Case

Retrofit Before Replacement: The Lagos Market Road Solar Lighting Business Case

2026-11-11

Lagos market alleys stay busy until well after dusk. The lighting is old, the grid is unreliable, and the cables are ageing. Vendors work in dim conditions, and the risk of theft, falls and vehicle collisions rises after sunset. The obvious question is not whether to improve lighting, but which intervention makes sense.

Three Options

Option What it involves Main drawback
Grid extension New cable, transformer, metering Cost, disruption, unreliable supply
New-build solar New poles, fixtures, brackets Higher capital cost and longer works
Retrofit solar Reuse poles, replace head and power Depends on pole condition

For crowded market lanes, retrofit usually wins. Existing poles are already positioned where people walk, so the lighting layout does not need to be redesigned. Installation is a head swap rather than a civil works programme, which means less disruption to traders.


For crowded market lanes, retrofit usually wins

The Site Constraints

  • Space: narrow lanes limit panel size and mounting options.
  • Rain: a long rainy season with high humidity demands real sealing, not a label.
  • Heat: year-round warmth accelerates battery ageing.
  • Security: fixtures must resist tampering and casual theft.
  • Access: maintenance must not require closing the market.

The Retrofit Checklist

  1. Inspect the existing pole: diameter, wall thickness, corrosion at the base.
  2. Measure the mounting height and the lane width to choose wattage and spacing.
  3. Select a split or semi-split design if the panel cannot sit on the head.
  4. Confirm the bracket fits without drilling new holes where possible.
  5. Size the battery for the rainy season, not the annual average.
  6. Agree a spare-parts kit and a cleaning interval with the market authority.

Phasing the Works

Phasing the Works

Market roads cannot be closed for a month. Retrofit suits phased delivery: one lane section at a time, installed between trading hours, with the old head removed and the new one commissioned the same morning. Traders keep working, and the authority can review a completed section before releasing the next.

The sequence that works is survey, sample section, review, then rollout. The sample section resolves the two questions that always appear on site: whether the existing pole is sound, and whether the bracket angle gives even light in a narrow lane.

The Economics

Retrofit reduces three cost lines at once: no new cable, no new pole, and no trenching. The saving is usually enough to fund a better battery and a spare-parts kit, which is where the long-term reliability comes from.

“We do not need a new lighting system. We need the one we have to work after dark." — Market association representative, Lagos

Retrofit is not a compromise. On dense market roads it is often the only option that can be delivered without disrupting the people the lighting is meant to serve.